This is what happens when you refurbish “unique” equipment. Whatever happened to the Turbo Trains? Read on.
Cuomo Administration Looks to Sell 4 Trains From Failed Rail Project – NYTimes.com.
Filed under: Amtrak, Passenger Rail Transportatio Policy, Regional USA Passenger Rail
Man, I used to love riding those things. Back in the 1970s they seemed pretty space age. Still, with all the grade-level crossings, I don’t see how you could ever run them at 120 mph.
I’ll be going up that way training it to Syracuse June 23rd.